To accommodate crews working on the Senior Center, from Thurs., Aug 1 through Sat., Aug 3 the Recreation Center elevator will be out of service. On Thurs., Aug 1, from 8am to noon, the Recreation Center locker rooms will be closed and the entrance to the Center will be limited to the southeast side, next to the lobby and the emergency exit.  Also, on Thurs., Aug 1, from noon to 5pm, the Recreation Center’s pool and locker rooms will be closed and the hot water will be shut off. We appreciate your patience during this time.

The Park District understands that the game table is underutilized. The game table will be removed and replaced with seating..

The basketball court is scheduled to be repaved this year, and the Park District is taking the opportunity to reorient the basketball court. The basketball hoop will be shifted to the East side to improve playing experience. The Park District explored relocating the basketball court, but due to the ravine and topography of the park the District  determined that the court is currently in the most suitable location.

The backstop is being removed because it  has reached it’s useful life and was damaged in a storm last year.  At this point, the District does not intend to replace the backstop because of limited use in its current location.

The playground will be closed beginning in August of 2024 until November 2024.

The 2-5 playground will have pour-in-place rubber surfacing. The woodchip surfacing at the 5-12 playground will also be replaced with new woodchips. In addition, concrete curbs will be added around both playgrounds.  

No, the racoon swings will remain. The post will be reused, and the swing seats will be replaced.

After careful evaluation of the 5-12 playground, the Park District identified that the playground equipment is in good condition and not in need of replacement.  Though, as part of this project, certain elements of the 5-12 playground will be replaced to extend the useful life of the playground and to improve the user experience. Updates to the 5-12 playground include: replacement of the steppers/ground play feature with a new climber, replacement of the woodchip surfacing, the addition of concrete curbing and the replacement of the play panels on the playground structure.

The park pathway was scheduled for repaving this year and the Park District saw this as an opportunity to improve the path layout. The new path will loop around the park to improve circulation.

No, the sand play element will be removed as part of this renovation. Despite the diggers being a favorite element, feedback indicated support for removing sand play.  

Two diseased trees will be removed as part of this project.