Fri, Jan 3: The Rec Center Fitness Floor has temporarily moved to the gym, now a fully equipped workout space, as repairs continue in the main fitness area.  Learn more.

Aside from the synthetic turf, what other drainage improvements are being made?

January 5, 2024

The synthetic turf field will drain to a naturalized area just beyond the right-field foul line. The design may also include expanding the existing naturalized area and enhancing the plantings to better manage any additional stormwater.  To impact the existing field as little as possible we have not added additional drainage improvements.