Tue, Dec 17: The Rec Center Fitness Floor has temporarily moved to the gym, now a fully equipped workout space, as repairs continue in the main fitness area.  Learn more.

What is the proposed playground surfacing for the new playground?

April 26, 2023

The plan proposes to use half poured-in-place rubber safety surface and half engineered-wood-fiber (woodchips).